Remodeling open school hall into double storey

Client:

Over Hill Primary School

Location:

No items found.

Services used

This is some text inside of a div block.

About the project

The work involved converting the open school hall into classroom partitions as well as provide for staff and children's toilets, without compromising the existing structure. The project duration was 4-5 months.

The role I played was to do structural design for the proposed new building to accommodate a first floor concrete slab. Thereafter, I executed the construction works. From setting out works, excavations, concrete works, reinforcement, wet wall finishes (plastering, skimming, painting, polishing existing terrazzo floor) to handover.

I am capable of executing any building construction work, be it a domestic (residential_housing) project, or commercial project (office building, shopping complex, etc)and even industrial project (fuel service station, warehouse, civil works on processing plants). I specialize in mass concrete works. I also specialize in remodeling works of any existing building structures.

Client testimonial by:

Over Hill Primary School

Kayinda's work on the school hall remodeling was truly exceptional. The transformation was carried out with precision, and the attention to detail was evident throughout. She doesn't just get the job done, but makes sure she delivers exceptional results. She goes above and beyond to ensure that the project undertaken exceeds expectations, and her professionalism shows through her works

Other jobs in this project

Similar jobs by other pros